求各位前辈看下,这个客户是什么意思?

李薇
内容如下: 这是他的第一封邮件: qty: 500 pcs. as frame contract; 5 call-offs with 100 pcs. (total qty will be taken within 12 months). delivery immediately after call-off, payment after the delivery (no advance payment for the frame contract). delivery with 5 pcs. on one ippc pallet (120*800mm) delivery term: ddu 42489 wuelfrath, germany tecnical drawing attached 下一封邮件: what i meant with my previous mail is, that we would need a price for the following (if it is acceptable for you): you produce 500 pcs total (frame contract), but the shipment every couple of weeks will only be about 100 pcs. (5 shipments), so that the total quantity will be delivered in about 6-8 months. if it is not convenient for you to keeping the qty on stock, you could maybe quote only 100 pcs and we will place new orders every couple of weeks. 这里面的call-off 是啥意思? 是不是这种协议签了,就是虽然是叫我们生产500套,但是每次他只拿100套,分五次,但是如果中间有问题的话,可能就会取消订单,换下单其他类型的产品??那我们工厂岂不是要有库存留下了哇?? 求各位前辈指导!新人不怎么懂。。。
2014-06-14 1017阅读
问题/讨论
回复(1)
我要向AI提问
AI回答:
这位客户的第一封邮件大概意思是需要500个产品,这将作为一个框架合同,在12个月内会有5个叫货(call-offs),每次仅需要100个产品。每次叫货后立即交货,付款在交货后进行,框架合同不需要预付款。交货需要采用5个产品放在一个120 * 800mm的IPPC托盘上送到德国42489 Wülfrath,并附上技术图纸。

该客户的下一封邮件想要确认的是,如果制造商愿意,他们需要500件产品,但每隔几周只需要约100件产品(5个叫货)以确保在6-8个月内完成总供应量。如果制造商无法保持这些产品的数量,他们可以报价仅供应100件产品,然后每隔几周下新订单。

你的理解是正确的,"call-offs"指叫货订单,每个叫货订单需要生产的产品数量为100,分5批。如果客户取消了某些叫货订单,你们的工厂将有剩余产品库存。
2023-06-11
追问:
  • samira
    你好,我不是前辈,我想说一下我自己的想法,我觉得你的客户是在征求你的意见,对于他的这种发货要求,首先是一般公司不接受的,这样的客户都用L/C的付款方式,他说五百件分五次发,钱不是一起打过来,那你就按发一百件报价,说是五百件的报价,就一百一百的好了。
    2014-06-21