⬅返回
情感分析
文章导读
    C. During the audit, factory is required to provide evidence to show the effectiveness of quality system implementation.在评估时,工厂必须提供能显示其有效地执行质量体系的证据。D. During the factory tour, we will take photo on general practices and facilities of the factory.在巡查工厂时,我们将会对一般操作和工厂设备进行拍照。E. No report will issue to the factory after the audit, factory may retrieve the copy from applicant as your need.在评估结束时,工厂不会得到报告。

    【Watsons验厂清单】
    屈臣氏验厂
    A. Pre-audit communication of the FQA Programme and Questionnaire
    评估前有关工厂质量评估计划和问卷的交流
    B. Field audit 实地评估
    1. Opening meeting with management 召开管理层会议
    2. Review pre-audit questionnaire 审阅评估前所做的问卷表
    3. Review the FQA programme 审阅工厂质量评估计划
    4. System manual & procedures look up 检查系统手册和步骤
    5. Factory tour 巡查工厂
    6. Closing meeting 总结会议
    Notes to auditee: 评估者要注意的事项:
    A. Our audit will mainly focus on the following areas:我们的评估主要集中在以下方面:
    1. Company Profile 公司概况
    2. Quality System 质量体系
    3. Purchasing 采购
    4. Design Control 设计控制
    5. Incoming goods and Materials 进来的产品和原料控制
    6. Manufacturing Process Control生产过程的控制
    7. Manufacturing Process Inspection生产过程的检验
    8. Final Inspection, Packing and Storage终检验,包装和储存控制
    9. Corrective and Preventive Action改正和预防措施
    10. Calibration校准
    11. Training and Internal Quality Audit培训和内部质量评估
    12. Housekeeping 厂房管理
    13. Health and Safety健康与安全
    14. Environment - Production, Dormitory, Canteen ... etc.环境 – 生产,宿舍,食堂等
    15. Product Safety产品安全
    16. Child Labor (Check Personnel Record)童工(检查人事记录)
    17. Worker's Wages Record工人的工资记录
    在进行实地评估前四天,请填写此表及所附的问卷表并以传真方式送达。只有通过由国际公认的认证机构ISO9000认证的工厂才有可能豁免某些评估项目。
    C. During the audit, factory is required to provide evidence to show the effectiveness of quality system implementation.
    在评估时,工厂必须提供能显示其有效地执行质量体系的证据。
    D. During the factory tour, we will take photo on general practices and facilities of the factory.
    在巡查工厂时,我们将会对一般操作和工厂设备进行拍照。
    E. No report will issue to the factory after the audit, factory may retrieve the copy from applicant as your need.
    在评估结束时,工厂不会得到报告。如你方需要报告,可以从申请者处得到复印件。
    F. Please confirm your acceptance of the audit programme by sign & chop below.
    如您接受此评估计划,请在下面签名和盖章。

    原文来自邦阅网 (52by.com) - www.52by.com/article/53141

    声明:该文观点仅代表作者本人,邦阅网系信息发布平台,仅提供信息存储空间服务,若存在侵权问题,请及时联系邦阅网或作者进行删除。

    评论
    登录 后参与评论
    发表你的高见