请高手看下这句话的表达到底哪里有错误

JULIANA2
The wind turbines from 3kw to 30kW can beproduced within 15 days,but the 50kw wind turbine needs 45 days.
2013-06-19 440阅读
问题/讨论
回复(6)
我要向AI提问
AI回答:
这句话的问题在于单词之间缺少空格。正确的表达应为:
The wind turbines from 3 kW to 30 kW can be produced within 15 days, but the 50 kW wind turbine needs 45 days.
2023-06-30
追问:
  • 爱上天空1987
    风机啊,这个我也有在
    2013-06-22
  • nm
    不错,简单利索
    2013-06-23
  • manesh
    都是高手....
    2013-06-21
  • ur.illusion
    讲英语的人应该都能看懂
    2013-06-21
  • Jan.Huba
    意思没问题,整齐一点的话可以这样
    The lead time is 15 days for 3KW to 30KW, and 45 days for 50KW.
    产品名称有时候可以省略
    2013-06-20
  • yoyo6
    The 3kw to 30kw wind turbines could be finished within 15 days,but 50kw product  need 45 days,
    2013-06-20
最新回答